Home/Projects/Bridge El Awsaty Ring Road With Elwahat tibeen train
Bridge El Awsaty Ring Road With Elwahat tibeen train
Solving the traffic jam that faces the intersection between the Middle Ring Road and Wahat road was a major purpose for constructing a bridge that creates an exit to the crowded vehicles. This bridge was among a large number of bridges the state decided to found to help daily road travelers and commuters, and this bridge was special as it overlooks the old railway line of Wahat.

In this project we used pre-cast beams, that proved their efficiency by being exposed to specified loading tests, and the surveying works done proved the accuracy of our works. The excellent manipulation of cranes helped us to do our job on time and with a zero loss margin
Bridge El Awsaty Ring Road With Elwahat tibeen train
Location
Cairo
Client
Armed Forces Engineering Authority
Field
Precast Concrete
Duration
4 Months
Value
36,800,00
Date
2020
Project Images